Primavera is a flexible database management solution suited for access control profile based networking.

 

Primavera Version 8 is composed as following :

 

PRIMAVERA P6: Primavera's main 100% web interface compiling all essential project portfolio management and administration features

 

PRIMAVERA P6 Professional: Primavera's client based planning and tracking interface. Installed on the client computer with and web access to the database

 

PRIMAVERA P6 Progress Reporter: An electronic time sheet updating management application

 

Primavera P6 Integration API: Primavera's P6 pre existent software integration interface.

 

Primavera P6 Analytics: An additional module presenting advanced reporting features

 

Previous releases of Primavera were composed of an add on web module


 


Product description

 

PRIMAVERA P6 is a turnkey planning solution ideal for planning, managing cost and resources and tracking projects and project portfolios. A single database is used to compile all relevant information and can be shared with all project stakeholders with no geographical and responsibilities restriction. The online interface allows convenient networking even in complex corporate structures.

 

 

Objectives

  • Optimization of corporate EPS and OBS structure
  • Planning and sequencing of tasks
  • Resource and cost management
  • Monitoring of progress and re-prioritization
  • Performance management support

 

 

Contact

 

Services

 

  • Licence distribution and integration
  • Full project and data migration
  • Strategic project support (operational planning)

 

 

Training

 

Benefit from our consultants’ international field based experience through customized PRIMAVERA P6 flexible training programmes based on tool practice with concrete case studies.


 

 

 

 

 

Your Need