Primavera P6 Introduction Training

MESLI Consulting is Oracle Primavera certified.

Primavera P6 Introduction Training

This Primavera Introduction course helps you learn Primavera P6, the leading project management software, by giving you a solid foundation in planning and scheduling.

If you want a practical and easy-to-follow Primavera P6 course, this session is perfect for quickly gaining confidence with the software.

Taught for several years, this training has proven very effective for many professionals. The course is regularly updated to include the latest features of Primavera P6 and the best project planning practices. Participants often highlight the clear teaching, high-quality materials, and the ability to apply what they learn immediately in their work.

Formation Primavera P6 MESLI Consulting

Learn how to use Primavera P6 Software

By submitting this form, I agree to be contacted by MESLI Consulting in accordance with the privacy policy.
Primavera training for effective project management – expert-led courses covering introduction, resource management, and advanced cost management.

Objectives of the Primavera P6 Introduction Training

  • Master the fundamentals of project management and professional scheduling
  • Use the Primavera P6 interface and structure a project using a WBS
  • Define activities, logical links, and scheduling constraints
  • Create a baseline schedule, read Gantt charts, and manage versions
  • Analyse project schedules and work effectively as part of a team
  • Follow a tailored course designed to suit your role and project requirements

Primavera P6 Introduction Training Program

DAY 1 : Introduction, structuring and creation of projects in Primavera P6

General introduction

  • The Fundamentals of Project Management
  • Architecture of the Primavera solution
  • Introduction to Primavera P6

Project structure in Primavera P6

  • Configuring EPS (Enterprise Project Structure)
  • Adding a project to the EPS
  • Using and Defining the Organisational Breakdown Structure (OBS)
  • Define the language in which the data is displayed

Create a project

  • Create a project
  • Changing parameters and settings for projects
  • Detailed information about the projects

Project Structure (WBS)

  • Create a Work Breakdown Structure (WBS) for your project
  • Setting up the hierarchical levels of the WBS
  • Set up and configure calendars
  • The different types of calendars: project, resources, and global
  • Assign several calendars to projects

Inserting Tasks

  • Create tasks
  • Details of the tasks
  • Creating links between tasks
  • Dissolve a task
  • Copy and Paste tasks
  • Definition and configuration of critical tasks
  • Assigning calendars to tasks
  • Set up and modify task identifiers

Definition of the Network

  • Definition of logical networks
  • Configuration of critical tasks
  • Definition of task constraints
  • Display total float and free float in the planning

Codes

  • Define and create project codes, resource codes, and task codes
  • Assigning a code to a task
  • Assigning a code to several tasks
  • Create task codes at the EPS level

Group & Sort – Filters – Layouts

  • Group and sort your data
  • Primavera filters by default
  • Filter task
  • Configuration of presentations and layouts
  • Using keyboard shortcuts to optimise data entry

DAY 2 : Ressources and skills, cost allocation with Primavera P6

Skills and Resources

  • Definition of project resources and skills
  • Resource details
  • Allocation of resources and skills
  • Define resource curves
  • Set up the histogram of stacked resources

Assigning Costs to Tasks

  • Assign expenses to WBS tasks and levels
  • Breakdown of the project budget

Planning optimization

  • Analysis of the critical paths of the project
  • Analysis of resources and histograms by batch
  • Resource levelling
  • Resource allocation

User Preferences

  • Planning time units
  • Setting dates and units
  • Select and display the currency
  • Specify a currency format
  • Change Password

Project Documentation

  • Assigning Documents to Project Tasks

DAY 3 : Controlling a project with Primavera p6

Assigning a baseline

  • Create a reference schedule (Baseline)
  • View the reference bars in the schedule

Project Execution and Control

  • Procedure for progress
  • Automatic update of the schedule
  • Plan your project with Primavera P6
  • Analyze the gaps with Primavera P6
  • Report creation wizards
  • Open multiple schedules simultaneously.
  • View resources with real progress

Thresholds – Alerts

  • Define project thresholds
  • Configure alerts

Risks

  • Identify risks related to planning
  • Consolidate the risk table

Layout and Printing

  • Edit and print reports
  • Print the resource histogram

Import and Export Data

  • Export your schedule to Excel and MS Project
  • Export your schedule in XML and XER formats.
  • Import your schedule into the primavera P6 database

Share your project with us

Leverage our expertise to ensure your projects stay on schedule and on budget. Let’s discuss your challenges and objectives today.